Welcome to Cobuilder Training Portal
Company level reports are now available in Cobuilder Collaborate! Users can generate reports on Project status, Chemicals, Risk management, BREEAM projects, Products and Supplier status.
Go to Reports from the main menu:
We can start with the Chemical report. The report shows all active chemicals under the selected org. element and whether they are in breach with the company requirement. You need to select level in the company hierarchy (region or subsidiary), set time period and add additional users if you wish. The report is sent to te user who is logged in.
After you have filled in the required fields you will notice that the button Generate report is now enabled. Click on it.
You will receive an email right away notifying you that the report is being generated. You will receive another email with a download link as soon as the report is ready.
The report is divided into two sheets: chemicals added by your organization and chemicals added by your subcontractors:
For the reports on Project status, Risk management and BREEAM projects you can choose only the org. element.
The Project status report shows main details of all the active projects placed under the selected org. element:
The report on Risk management shows data on total number of delivered SDS’es and for how many of them the company have completed risk management. You will also see to sections to the right where the SDS’es er divided based on presence or absence of deviation:
The BREEAM projects-report shows total number of delivered products. Number of products missing CO (which are not classified) are shown in a separate column as the type (CO – construction object) is triggering BREEAM requirements. You will see number of products with BREEAM requirements and also number of products with completed BREEAM assessment. There are in addition to sections where products are divided into BREEAM A20 requirements and BREEAM HEA 9/02 requirements:
The Products report shows all active products under the selected org. element, what kind of environmental documents they have and whether they are missing required legislative documentation. It is divided in two sheets for the responsibility of the main contractor and the responsibility of the subcontractors. Download link will be sent via email.
The Supplier status report shows all active invitations to projects under the selected org. element and their status. Download link will be sent via email.