Welcome to Cobuilder Training Portal
You can close chemical deviations by creating a risk management for the chemical. A product that breaches one of the project’s chemical requirements but has a completed risk management is excluded from the deviation count on the dashboard and from the Deviations menu.
Find the chemicals that need a risk management
1
2
3
Start a risk management
4
5
A new window opens with an 8-step process. The first step, Load data from company template, is optional. Click Continue without template to fill in everything from scratch, or click Select next to a template in the list to load its data. Read more in How to create a risk management template.
Risk assessment, elimination and substitution
6
Select the Frequency of use and Exposure level for the chemical. Click the info icon next to Exposure level to see examples of what each level means. The system then calculates the risk assessment value. On the right, Risk level statuses shows the limits used to classify the risk as Low, Medium or High. Click Next step.
7
The next step asks whether the chemical can be eliminated. Click Eliminate if you can use a technical process instead of the chemical, write a comment (required) and click Finish – the risk management is then complete. To go on with the process instead, click Continue to substitution, optionally add a comment, and click Next step.
8
In Chemical substitution, look for a less hazardous chemical to replace it with – either from a company substitution group (Load chemicals from company substitution groups) or by searching in Cobuilder Supply (Search in Cobuilder Supply). Read more in How to create a chemical substitution group.
9
Tick the alternative product in the results and click Compare. The system shows the risk values for both chemicals side by side, with the original’s Frequency of use and Exposure level preselected – adjust them for the new product if needed. Select No substitution or Make substitution, write a comment explaining why (required), and click Next step. For a full walkthrough of this step, see How to substitute a chemical using the substitution group.
Measures and personal protective equipment
10
11
In Select personal protective equipment, choose the equipment that is used. When you select one item, equipment that can’t be combined with it is marked Not applicable due to current selection. The more relevant equipment you select, the lower the health risk (Health risk level with protective equipment) – but only select equipment that is actually used when working with the chemical. Note the warnings on this page: you should consider PPE even if the chemical’s labelling shows no health hazard, and by selecting PPE you confirm that the conditions for its proper use are met. Write a Conclusion (required) and click Next step.
Final conclusion and follow-up
12
The last step, General risk level conclusion, shows a suggested General risk management status level, which you can change if needed. Add a comment if anything is missing to meet the authorities’ requirements for risk evaluation, and write a Final comment (required). The page also lists points a)–k) from FOR-2011-06-1357 (the Norwegian regulation on the performance of work), which the Norwegian Labour Inspection Authority considers particularly important for the risk assessment. Click Finish at the top right.
13
14